FIT/microFIT
For more information visit www.powerauthority.on.ca/FIT ; or call the FIT Program Call Centre at 1-888-387-3403
Review Available Generation Capacity (June 30, 2011)
|
Feed-In Tariff Prices for Renewable Energy Projects in Ontario Base Date: September 30, 2009 |
|||
|
Renewable Fuel |
Size Tranche |
Contract Price (0/kWh) |
Percentage Escalated4 |
|
Biomass'1,2 |
|
|
|
|
|
≤ 10 MW |
13.8 |
20% |
|
|
> 10 MW |
13.0 |
20% |
|
Biogas'1,2 |
|
|
|
|
On-Farm |
≤ 100 kW |
19.5 |
20% |
|
On-Farm |
> 100 kW ≤ 250 kW |
18.5 |
20% |
|
Biogas |
≤ 500 kW |
16.0 |
20% |
|
Biogas |
>500 kW ≤ 10 MW |
14.7 |
20% |
|
Biogas |
> 10 MW |
10.4 |
20% |
|
Waterpower'1,2,3 |
|
|
|
|
|
≤ 10 MW |
13.1 |
20% |
|
|
>10MW ≤ 50MW |
12.2 |
20% |
|
Landfill gas'1,2 |
|
|
|
|
|
≤ 10MW |
11.1 |
20% |
|
|
> 10 MW |
10.3 |
20% |
|
Solar PV |
|
|
|
|
Rooftop |
≤ 10 kW |
80.2 |
0% |
|
Ground-mounted5 |
≤ 10 kW |
64.2 |
0% |
|
Rooftop |
> 10 ≤ 250 kW |
71.3 |
0% |
|
Rooftop |
> 250 ≤ 500 kW |
63.5 |
0% |
|
Rooftop |
> 500 kW |
53.9 |
0% |
|
Ground-mounted2 |
≤ 10 MW |
44.3 |
0% |
|
Wind2 |
|
|
|
|
Onshore |
Any size |
13.5 |
20% |
|
Offshore |
Any size |
19.0 |
20% |
1. Peak performance factor applies.
2. Aboriginal price adder and community price adder eligible as outlined in Appendix A below.
3. In the case of an incremental waterpower project, the incremental project together with the existing generating facility to which it is incremental cannot exceed 50 MW.
4. Percentage escalated will be applied to eligible renewable fuels as calculated in Exhibit B of the FIT contract.
5. MicroFIT ground-mounted solar price category became effective July 2, 2010.
Note: In the case of an incremental solar project, the incremental project together with the existing generating facility to which it is incremental cannot exceed 10 MW
Appendix A: Maximum Aboriginal Price Adder and Maximum Community Price Adder*
The following table sets out the price adders for Aboriginal and community-based projects
|
Renewable Fuel |
Wind |
Solar PV (Ground Mounted) |
Water |
Biogas |
Biomass |
Landfill Gas |
|
Maximum Aboriginal Price Adder (¢/kWh) |
1.5 |
1.5 |
0.9 |
0.6 |
0.6 |
0.6 |
|
Maximum Community Adder (¢/kWh) |
1.0 |
1.0 |
0.6 |
0.4 |
0.4 |
0.4 |
*The percentage of the maximum Aboriginal price adder or maximum community price adder added to the FIT contract price is based on the Aboriginal or community participation level as defined in the FIT Rules.
Micro-Embedded Generation Facility Connection Agreement Provides the terms, conditions, and technical requirements for generators that are 10 kW or less.
Small and Mid-Sized Embedded Generation Connection Agreement Provides the legal terms and conditions for embedded generators that are greater than 10 kW.
Application to Connect microFIT Project to Greater Sudbury Hydro Inc's Distribution System
Distributed Generation Connection Impact Assessment Review (10kW - 10MW) Form